Drol Apartments, Jahi – Phase 2
A second phase of work at Drol Apartments: installing a 5kVA hybrid inverter, 10 solar panels, and a 10kWh lithium battery system.
Illustrative photoThe property needed a hybrid solar and battery backup system installed to reduce reliance on grid power and generator use.
We installed a 5kVA hybrid inverter, 10 units of solar panels, and a 10kWh lithium battery bank, sized to the building’s load.
The property now runs on a hybrid solar and battery system for its day-to-day power needs. That the client came back to us for this, instead of bringing in another contractor, says something about how the first phase went.
Read full review on Trustpilot →Kell Electricals did an outstanding job at my Gwarinpa home! They professionally installed my inverter and solar panels, set up my CCTV system, and replaced my home's switches, all of which are working perfectly. Their team was incredibly professional, and their work was remarkably clean and precise. For top-notch electrical services, I highly recommend Kell Electricals!
Chiemeria G EbubeDike
June 27, 2025
Read full review on Google →It was the most perfect service I have received in Nigeria so far.
And the follow up was very helpful
Daniella
1 month ago
Have a similar job in mind?
Tell us about the site and what you need done. We'll look at it the same way we looked at this one.
