Kelechi Nnajiofor
Posted on Google
The work was really neat and had a general good outlook, also liked how mild and soothing it came out.
Questions? Call us+234 814 020 5895

Before recommending solar sizing, generator changes, or efficiency upgrades, we measure. An energy audit maps actual consumption by circuit and load, flags inefficiencies and unsafe conditions, and gives you a prioritized, costed action plan.
Consumption measurement
Consumption measured by circuit and major load. Nameplate ratings don’t show real use.
Thermal imaging
A thermal scan to flag developing faults and inefficiencies not visible by eye.
Load profiling
Consumption pattern mapped against tariff or generator fuel cost to show where money is actually going.
Recommendations report
You get a prioritized, costed action plan.
For energy audits, depending on the project and the agreed scope. We provide documentation appropriate to the size and complexity of the job.
All engineering deliverables →For inspection and assessment projects: site observations, existing condition, identified issues, photographic records, load information, and recommended next steps.
Connected loads, estimated demand, circuit schedules, distribution requirements, and existing versus proposed loads, giving a clearer basis for design and upgrade decisions.
A clear breakdown of what needs immediate attention, what can be monitored, and what can be scheduled as a future upgrade, so you can prioritize rather than treat every issue as equally urgent.
Both. We supply solar panels, batteries and inverters, and we do the installation and commissioning ourselves. We still run a load assessment before recommending or supplying equipment, because the right panel count and battery capacity depend on your actual consumption.
It depends on the property's size, current wiring condition, and how many circuits, sockets, and fixtures are involved. Rewiring a two-bedroom flat and a multi-storey house aren't comparable jobs. We don't quote a number without a site visit, since guessing risks under- or over-pricing the actual scope. Request a quote and we'll assess the property directly.
Hybrid inverter and battery system pricing depends on inverter capacity, battery chemistry and bank size, and whether it's a backup-only setup or one designed to carry most of your daily load (see our guide on sizing a hybrid inverter system for why that distinction matters). We size and quote from a real load assessment.
It scales with scope. A few automated lighting circuits costs far less than whole-property lighting, climate, and access control on one platform. Retrofitting an existing property also typically costs more than wiring automation into a new build from the start. We scope and quote after understanding what you actually want to control.
Describe the job in a few lines. We'll come back with a proper scope for it.